|
Dells Dam, Wisconsin Bridging the Black River Transcribed by Crystal Wendt
February 1954 Possibly the one man who has had the most to do with the old Dells Dam bridge over Black River, now to be torn down, is Guy Schultz, chairman of the town of Levis. He helped to erect the bridge in 1918. He looked out on it every day from his farmhouse, near by. Also he presided at the Levis town board meeting when arrangement of the sale of the bridge was made to Phillips, of Eau Claire. The bridge, for which the town of Levis is getting $900, was erected in 1918 at a cost of exactly $6, 666, 66. Where all those sixes came from is anybody’s guess; but it’s a cinch, in Mr. Schultz’s language that the Elkhart (Indiana) Bridge & Iron Co., its builder, lost their shirt on this job. The reason, according to Mr. Schultz, was that the bids were received in 1916. Before the bridge could be built, the United States entered into World War I against Germany. That move tied up steel production in the nation, and there was no steel available for a bridge at Dells Dam. In the meantime, the price of steel boomed and the cost of labor increased. So when 1918 came the erection of the Dells Dam bridge was completed, the Elkhart Bridge & Iron Co. had substantial reason to regret its monotonous-sounding bid price. By way of coincidence, World War Ii and subsequent channeling of steep production, also delayed the building of the new highway 95 bridge, located upstream a few hundred feet from the old iron overhead. The old Dells Dam bridge was erected to replace a previous bridge, which "went out on top of an ice jam," Mr. Schultz recalls. For over two years those who wanted to cross the stream either had to ford it at a place where the Indians cleared boulders and rocks for a narrow strip across, or go to the Six-miles upstream. The erection of the Dells Dam bridge required about three months, with 10 men working on the project, Mr. Schultz recalls. Most of the work was done by hand tools. The only motorized equipment was a gas engine-driven cement mixer. The big, heavy superstructure was raised over false work by use of a "traveler" hand winch and a triple block and line. |
|
**This Clark Co., WI Internet Library, ALHN & AHGP website is dedicated to the free sharing of information by researchers, local historians, genealogists and educators. Because of our non-profit status, submissions are not to be used for profiteering of any kind. Our representatives cannot accept gratuities beyond the basic expenses (i.e. postage, copying, courthouse or rental fees) for obtaining requested information. We reserve the right to ban the involvement of anyone who intentionally disregards these policies. Promotion of research services or publications is not permitted on these pages, or by our representatives without the prior endorsement of the site overseers. If you need professional help, we recommend contacting an accredited genealogist. Please show your appreciation for this database by Becoming a Clark County History Buff or making a contribution to our Support Fund and Perpetual Preservation Account to help keep this Clark Co., WI database freely available on the World Wide Web and free from commercial enterprise.
*** This copyrighted Clark Co., Wis. genealogy and history material is used on this nonprofit site with permission of the submitter. Contact us if you are personally aware of anyone using this submitted data inappropriately. It may not be copied and posted on any commercial genealogy sites such as Family Tree Maker or the merged companies Ancestry.Com/RootsWeb/MyFamily or sold for personal profit.
This page is a part of the Clark County, WI Internet Library Project Every submission is protected by the Digital Millennium Copyright Act of 1998. ~~The Clark Co., Wisconsin History Buffs maintain these pages in support of Free On-line History & Genealogy~~
|